Submit an air pollution control measurement report on continuous measurements of air pollutants from medium-sized combustion plants in accordance with the 44th BImSchV
If you operate a medium-sized combustion plant, gas turbine or internal combustion engine plant, you must determine pollutant emissions by means of continuous measurements under certain conditions.
You must prepare a measurement report on the results of the measurements for each calendar year and send this to the immission control authority responsible for you by the deadline.
Forms/Online Services
Responsible authority
Contact
Contact
Details
Prerequisite
You are the operator of a medium-sized combustion, gas turbine or internal combustion engine plant.
Procedure
- You analyse the continuous measurements of each calendar year.
- You prepare a measurement report on the results.
- You send the measurement report to the immission control authority responsible for you by the deadline.
Deadlines
- You must submit the measurement report for a calendar year to the responsible immission control authority by 31 March of the following year at the latest.
- You must keep the measurement report and the records of the measuring devices for at least 6 years after the end of the respective reporting period.
Required documents
Complete measurement report
Costs
None
Miscellaneous
Please ensure that you submit the measurement report to the immission control authority responsible for your plant.
Legal basis
- § 26 Messungen aus besonderem Anlass
- § 29 Kontinuierliche Messungen
- § 29 Kontinuierliche Messungen
- § 30 Auswertung und Beurteilung von kontinuierlichen Messungen, Messbericht